Project Overview

The Expressway Construction project represents one of our most challenging infrastructure undertakings, involving the construction of a major highway with complex engineering requirements. This project required precision earthworks, bridge construction, and extensive coordination across multiple construction phases.

Project Duration

36 Months

Project Value

KES 500M+

Team Size

150+ Workers

Equipment Used

30+ Machines

Services Provided

  • Highway excavation and grading
  • Bridge foundation works
  • Drainage system installation
  • Material supply and transport
  • Heavy machinery operations
  • Road construction and paving
  • Safety management
  • Project coordination

Challenges & Solutions

Challenge

Managing traffic flow and maintaining access to existing roads while conducting major construction works across multiple sections.

Solution

Implemented phased construction approach with temporary road diversions, 24/7 traffic management, and real-time communication with local authorities.

Challenge

Coordinating complex bridge construction and foundation works in challenging terrain with varying soil conditions.

Solution

Used advanced soil testing, specialized foundation techniques, and modular bridge construction methods to ensure structural integrity.